Villa Roof — Waterproofing and Thermal
Jeddah · 230 m² · 4 days
We fix the cause before we cover it
Our rule is simple: we never insulate over an untreated problem. We locate the leak source first with modern detection equipment and no random demolition, repair cracks and falls, then apply the right insulation and flood-test it for 48 hours before the final covering.
How we deliver
Roof surveyed, leak source or weak points identified.
Detection equipment used to pinpoint the position before any demolition.
Damaged layers removed, cracks and drain surrounds repaired.
Falls formed so water drains rather than pooling.
Primer then the insulation layer, turned up onto surrounding walls.
48-hour flood test and verification before final covering.
Our track record
230+
Insulation projects
45k+
m² insulated
48 hrs
Flood test per project
90+
Leak detection cases
Equipment pinpoints the leak and saves significant repair cost.
Cleaning, crack repair and falls corrected before any layer goes down.
48 hours of testing before covering, to confirm there is no leak.
Waterproof, thermal, or foam that does both — based on your actual problem.
Damp patches or peeling paint on top-floor ceilings, an unexplained summer electricity rise, or more than 10 years since the last insulation.
We treat the cause first: locate and repair the leak — which may be a pipe inside a wall rather than the roof — then insulate.
Yes, with a protective top layer (tiling or protective screed) that allows walking and use without damaging the insulation.
Ready to start your Insulation & Leak Detection project?
Free site visit and a detailed quote within 24 hours.
Read the in-depth guide & pricing