Sandwich Panel Warehouse
An insulated warehouse for heat-sensitive goods, at lower cost and in less time than concrete.
Location
Riyadh
Area
420 m²
Duration
5 weeks
Year
2025
Client
Commercial facility
The challenge
The stored goods are affected by high temperatures, and a concrete building would have taken months and exceeded budget.
What we delivered
We erected a steel frame clad in 7.5 cm sandwich panel on walls and roof, noticeably lowering internal temperature versus single-skin sheeting, and handed over within five weeks.
Project specification
| المساحة | 420 م² |
|---|---|
| سماكة الألواح | 7.5 سم |
| الجدران والسقف | ساندوتش بانل بالكامل |
| الهيكل | معدني مجلفن |
| الباب | رول 4 × 4 متر |
| مدة التنفيذ | 5 أسابيع |
Scope of works
- التصميم والمواصفات
- القواعد والهيكل المعدني
- تركيب الألواح
- الأبواب والفتحات
- إحكام الوصلات
- التسليم
From site
Have a similar project?
Free site visit and a detailed quote within 24 hours.
About our Sandwich Panels service